Amthane Water Infrastructure Project will Ensure 365-Day Water Availability for Porvorim and North Goa: Minister Rohan A. Khaunte

  1. Home
  2. General
  3. Amthane Water Infrastructure Project will Ensure 365-Day Water Availability for Porvorim and North Goa: Minister Rohan A. Khaunte

Minister for Tourism and MLA for Porvorim, Shri Rohan A. Khaunte, today welcomed the commissioning of the ₹150 crore Amthane Pump House and the 1200 mm & 1000 mm DI Pipeline from Amthane to Cunchelim 150 MLD Raw Water Conveyance Scheme, stating that the landmark project will ensure the availability of raw water 365 days a year for the Water Treatment Plants serving Porvorim, Assonora, and Pilerne. By eliminating the seasonal disruption in raw water supply during the annual maintenance of the Tillari canal, the project will ensure a reliable and uninterrupted supply of water throughout the year for residents across these areas. The project was inaugurated today by Hon’ble Chief Minister Dr. Pramod Sawant and is operational with immediate effect.

Speaking on the occasion, Shri Rohan A. Khaunte, who was present at the inauguration ceremony alongside other dignitaries, said:

“For years, Porvorim and parts of North Goa were dependent on raw water from the Tillari canal. Every year, when the Tillari canal is shut for its annual maintenance during November and December people would often face water shortages, which coincided with the festive season of Diwali, Christmas and New Year. During this period water demand across this region is significantly higher. With the commissioning of the Amthane Pump House and Raw Water Conveyance Scheme, the Water Treatment Plants at Porvorim, Assonora and Pilerne will now receive raw water, ensuring reliable water availability for all 365 days. This is a major step towards strengthening water security for our people and supporting the future needs of our growing communities.”

“I sincerely thank Hon’ble Chief Minister Dr. Pramod Sawant, Hon’ble Water Resources Minister Shri Subhash A. Shirodkar, Government of Goa, and the engineers and officials who worked tirelessly to make this project a reality. We will continue working together to strengthen essential infrastructure and improve the quality of life for the people of Goa.”

The commissioning of the Amthane Pump House and the high-capacity transmission pipeline is expected to improve the efficiency of raw water conveyance to key treatment plants, thereby strengthening the drinking water distribution network across North Goa and creating additional capacity to meet future demand.

The Amthane Dam serves as a crucial backup raw water source for North Goa—including Porvorim and the rest of Bardez taluka—supplementing supplies when the primary Tillari canal system faces disruptions. Raw water from the Amthane Dam is channelled to water treatment plants like Assonora to feed local reservoirs. Outfitted with four high-capacity vertical turbine pumps; two will run continuously while two remain fully operational as Emergency Spares. This ensures an instant system recharge if main water treatment plants face sudden surges or peak seasonal demands.

Previous Post
Taleigao Block Congress Holds Karyakarta Melava; Girish Chodankar Calls for Election Readiness and Grassroots Unity
Next Post
Technology-meets-convenience; Goa DRS introduces app based collection for HoReCa’s as part of the first phase of the roll – out focusing on alcohol
Menu